Western Bushveld Joint Venture Expands to Three Drills Operating
Northern Bushveld Intercepts Confirm Open Pit Potential
Platinum Group Metals Ltd. (PTM-TSXV; PTMQF-OTCBB) announces the expansion of its Western Bushveld Joint Venture drilling campaign with three drills currently operating. The program has been accelerated as a result of high-grade initial results and the existence of obvious targets for potential resource expansion.
The objectives of the current program are:
1) to advance the initial inferred resources of 4.8M ounces, including 15.41 Mt at 7.92 g/t- 4E (platinum, palladium, rhodium, and gold) on the Merensky Reef toward a feasibility study; and
2) to expand the known resources along strike and up dip, particularly where the Merensky Reef is known to be present from previous drilling and additional holes are required to increase the resource assessment.
The Western Bushveld Joint Venture has approximately 11 kilometres of strike length to investigate. The initial resource covers approximately 2.6 kilometres of strike length and 15% of the mineral rights. The resource and target areas for drilling are from zero to 550 metres depth in a tabular shallow dipping configuration as typically found on the Western Limb of the Bushveld Complex.
WBJV-01 intersected the Merensky Reef within 10 metres of the projected depth (projected from holes 500-1000 metres away within the resource). The initial intercept of PTM''s program, is reported here:
9.13 g/t 3E (6.06 g/t platinum, 2.74 g/t palladium, and 0.32 g/t gold) over 0.45 metres at 448.2 metres.
4.30g/t 3E (2.84 g/t platinum, 1.30 g/t palladium, and 0.17 g/t gold) over a 1-metre mining cut
WBJV-01 deflection D2 reports:
10.64 g/t 3E (7.88 g/t platinum, 2.32 g/t palladium, and 0.43 g/t gold) over 0.59 metres at 441.57 metres
6.33g/t 3E (4.67 g/t platinum, 1.38 g/t palladium, and 0.27 g/t gold) over a 1-metre mining cut
The values from these intercepts are typical of the values from surrounding holes in the stated resource and confirm the high-grade nature of the Merensky Reef facies in this area. Rhodium and the other platinum group elements will add to the values. WBJV-01 deflection D1 was targeted on the UG2 reef alone and the UG2 Reef reported low values over 2.6 to 3 metres as anticipated for this area.
Additional step out holes along strike from the known resource are intersecting the predicted marker layers and assays for reef intersections are pending.
PTM and Anglo Platinum each hold a 37% interest in the joint venture, with BEE partner Africa Wide Mineral Prospecting and Exploration Company (Pty) Limited holding 26%. The following are the distinguishing features of the PTM -- Anglo Platinum -- Africa Wide Joint Venture:
• The project offers both shallow exploration targets and near term development potential targeted on the Merensky reef from zero to 550 metres in depth. The large property position is up-dip and on strike from large scale resources and active mining respectively (total resources 69M ounces 4PGE''s); and
• The target is the Merensky Reef on the Western Limb with the best track record of mining in the Bushveld Complex; and
• The grades are measured as 4E only, platinum, palladium, rhodium and gold in the resources and the other PGE''s are present, but not included in the grades at this time (7E); and
• 30% geological losses and dilution to mining widths are already applied to all results and resources as these are deemed to be warranted for a conservative assessment of any area before mining commences.
North Limb Intercepts -- War Springs Property
Fill-in drill hole #15 on the War Springs Property has successfully intercepted the C reef with results of 1.89 g/t and 0.29% combined Nickel and Copper over 10 metres (0.33 g/t platinum, 1.46 g/t palladium, and 0.11 g/t gold, .16% Ni, .13 % Cu) at 137.0 to 147.0 metres depth. This shallow intercept from Hole 15, between 500 metres spaced Holes 3 and 4, confirms the continuity of the C reef for an initial 750 to 1000 metres of length at potential open pit depth. Assays from Hole 15 for the B Reef located below the C Reef are pending as are the results for Hole 14. Holes 11, 12 and 13 where shallow vertical exploration holes and did not test the reefs.
The following are distinguishing features of the War Springs mineralization:
• The target is at open pit depth with relatively high gross metal value compared to other resources in the North Limb of the Bushveld Complex; and
• The continuity of layering at War Springs tested so far is excellent over approximately 2 kilometres, which is highly unusual for North Limb terrain; and
• The well layered nature of the mineralization, geology, geophysical expression and soil signatures all show excellent continuity, which will assist in resource evaluation and scoping work -- the next step for the project; and
• Up to 2.0 kilometres of the layered sequence south of the known zone remains yet to be explored and drilled.
Qualified Person, Quality Control and Assurance
Mr. Willie Visser is acting as the Qualified Person, "QP" for Platinum Group Metals (RSA) (Pty) Ltd., "PTM RSA" a wholly owned subsidiary of PTM, for this release on the War Springs Platinum Project. He is registered with the SACNASP (South African Council for Natural Scientific Professions) (Registration No. 400279/04). Mr. Visser is the Exploration Manager for PTM RSA with 15 years experience as a geologist, including Senior Resource Manager experience. Information on regional deposits has been acquired from public information and is believed to be reliable.
The samples for the Western Limb Joint Venture were analyzed for Au (ppb), Pt (ppb) and Pd (ppb) by standard 30g Fire assay fusion-lead flux with Ag collector with an ICP-AES. The samples were assayed at ALS Chemex Laboratories Pty Ltd in Johannesburg. PTM employs a rigorous quality control program, which includes insertion of blanks, duplicates and certified reference materials in the assay stream once in every 24 or fewer samples. This is in addition to internal quality control measures undertaken by the contracted analytical facilities. For the samples reported here palladium values from PTM reference material were reported by Chemex just below the two standard deviation low line from round robin results for the standard. The samples were re-run on the pulps and Pt subsequently passed the QAQC while some Pd values still failed low. As a result of small sample sizes the core will need to be re-sampled if palladium is to be reassessed. The War Springs results were completed with the same approach by Genalysis of Perth Australia and these results had no quality control issues.
About PTM
PTM is based in Vancouver BC, Canada and is focused on the exploration and development of platinum and palladium projects in Canada and South Africa. PTM is exploring on significant mineral rights in the Northern and Western Bushveld Platinum Complex of South Africa including the large-scale joint venture with Anglo Platinum Corporation in the Western Limb of the Bushveld Complex. PTM is also the largest mineral rights holder in the area surrounding Canada''s only primary platinum and palladium mine near Thunder Bay, Ontario and is drilling a new platinum and palladium discovery within layered intrusions in this region. PTM has a second active joint venture with Anglo Platinum near Sudbury, Ontario, Canada.
On behalf of the Board of
Platinum Group Metals Ltd.
"R. Michael Jones"
President and Director
- 30 -
For further information contact:
R. Michael Jones, President
or John Foulkes, Manager Corporate Development
Platinum Group Metals Ltd., Vancouver
Tel: (604) 899-5450 / Toll Free: (866) 899-5450
Larry Roth
Roth Investor Relations, NYC
Tel: (732) 792-2200
The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.
Note to U.S. Investors: Investors are urged to consider closely the disclosure in our Form 20F, File No. 0-30306, available at our office: Suite 328-550 Burrard Street, Vancouver BC, Canada, V6C 2B5 or from the SEC: 1(800) SEC-0330.