Lakemount Ni-Cu-PGM Project Drill Targets Expand

March 22, 2004

Platinum Group Metals Ltd. (PTM:TSXV) reports that drilling will resume as soon as possible at the Lakemount Ni-Cu-PGM Project located near Wawa ,Ontario. A drill contract for a further 1,500 metres of drilling is out for tender. A budget and details of this program will be announced in the next few weeks when a drill is mobilized. The drilling will test both exploration targets highlighted from the computerized 3-dimensional geological modeling of the 146 previous holes and PTM''s 8 recent holes and new geophysical targets located outside the known mineralized zones.

The geological modeling and geophysical results indicate significant potential to expand the known Lakemount Zone and discover new previously unidentified nickel, copper, and PGM (Platinum-Palladium-Gold) mineralization within the 2 kilometres long Sunrise Intrusion. Also outside the known Lakemount mineralized zones, several conductors have been identified, from the recent PTM detailed helicopter borne magnetic and electromagnetic surveys. These conductors will also be the focus of the new drilling program.

Initial geological computer modeling of the Lakemount Project, including the integration of 8 recently drilled holes by PTM and 146 earlier holes drilled from the 1942 to 1957, shows well-correlated and traceable zones of nickel, copper, platinum, palladium and gold mineralization ("Ni, Cu, and PGMs"). Although PGM assays were not systematically conducted on the earlier drill core from 1942 to 1957, PTM''s drilling indicates that PGMs will provide a significant contribution to the overall metal value of the mineralization. (See News Release NR- 04-75, February 3, 2004). The modeling indicates clear areas of potential to step out from Hole 7 and Hole 8. Hole 7 reported an intercept of 0.67 % Ni , 0.30 % Cu, and 0.393 grams per tonne of PGM over 11.5 metres and Hole 8 that reported an intercept of 0.87 % Ni, 0.48 % Cu, 0.588 grams per tonne of PGM over 13.5 metres including an intercept of 1.40 % Ni, 0.69 % Cu, and 0.769 grams per tonne of PGM over 5.0 metres.

In March 2004 PTM completed a deep-penetrating helicopter-borne time domain EM and magnetic geophysical surveys with the objectives of identifying targets for further drilling to expand on known zones with better than 0.5 % Ni and associated Cu and PGMs and to locate new previously unknown zones. The detailed (50 to 100 meter line spacing) geophysical survey identified at least four clear conductive targets associated with the Sunrise Intrusion that are located outside the known mineralized zones. Detailed profiling and data interpretation from the survey is underway. The detailed geophysical data obtained will be integrated into the 3D geological model from the historic and PTM drill hole database. This work is anticipated to develop additional target zones.

One of the target conductors identified lies adjacent to the main body of mineralization within the Lakemount Intrusion and has never been drill tested. A second strong conductor is located at the western end of the Lakemount Intrusion some 2,000 metres away from the main body of mineralization. This second conductor is associated with the western rim of the intrusion (a similar setting to the main mineralized zone on the east rim) and this target also appears to never have been drill tested.

PGM assays were not systematically conducted on the earlier drill core from 1942 to 1957 and the details of the Ni and Cu assays and quality controls are also not available. All of the composite intersections that are available have been entered into PTM''s internal three-dimensional database and these results appear to correlate well with PTM''s own Ni, Cu results in the same areas. Historic data for the Lakemount Project is not presented here in its entirety for disclosure purposes, as the Qualified Person has no assurance as to the completeness, accuracy, reliability, or representative nature of the data. However the historic drill hole data available does provide a strong qualitative indication of the continuity and orientation of the mineralization and provides a sound guide to expand for the exploration and development of the better grade zones within the system. See the Lakemount maps and 3D model at www.platinumgroupmetals.net for more information.

Qualified Person
Dennis Gorc, P. Geo. is the Qualified Person for this release. Mr. Gorc is the Manager of Research and Acquisitions for the Company and is not independent as he is a founding shareholder of the Company. He is registered with the Professional Engineers and Geoscientist of British Columbia and the Association of Professional Geoscientists of Ontario. He is directing the Lakemount exploration program. Mr. Gorc has a degree in geology and more than 25 years relevant experience in base and precious metals exploration and evaluations.

About PTM
Platinum Group Metals Ltd. is based in Vancouver BC, Canada and has active exploration programs in Canada and South Africa. PTM, as the name suggests, is focused on exploration and development of platinum, palladium, and other platinum group element resources. The Company sees both platinum and palladium as important in its vision and mission. The Company''s large portfolio of PGE projects across Canada and South Africa distinguishes the Company from its competitors.

PTM holds significant mineral rights on the Northern and Western Limbs of the Bushveld Complex in South Africa and is continuing to acquire additional mineral rights in the world''s premier platinum producing district. The Northern Limb is the area of the world''s largest open pit platinum mine, the PPRust Mine and a large-scale exploration project of African Minerals. PTM is currently completing surface exploration, to target drilling on its War Springs Platinum Project on the Northern Limb, South Africa. Initial drilling and assay results at the Tweespalk platinum property, also in the Northern Limb are encouraging. Further assays are pending and near term continued drilling is now being planned.

On behalf of the Board of
Platinum Group Metals Ltd.
"R. Michael Jones"
President, Director

- 30 -

For further information on Platinum Group Metals visit our website www.platinumgroupmetals.net or contact:
R. Michael Jones, President
John Foulkes, Manager Corporate Development (604) 899-5450
Platinum Group Metals Ltd.

Larry Roth (732) 792-2200
Roth Investor Relations

The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.

Note to U.S. Investors: Investors are urged to consider closely the disclosure in our Form 20F, File No. 0-30306, available at our office: Suite 800 -- 409 Granville Street, Vancouver BC, Canada, V6C 1T2 or from the SEC: 1(800) SEC-0330.