High Grade Nickel Copper Platinum Palladium Drill Intercept From Lakemount Phase 2 Drill Program

May 7, 2004

Platinum Group Metals Ltd (PTM-TSXV) reports that assays returned a well-mineralized intercept from Hole 16 of its Phase 2 drill program at the Lakemount Project near Wawa, Ontario. Results for Holes 1 to 8 from Phase 1 drilling were published in the Company''s news releases dated February 3, 2004 and January 27, 2004. Assay results for remaining Phase 2 Holes 9 through 15 are pending and will be reported as soon as possible. Some of these pending holes have also intersected the target sulphide mineralization as seen in other holes.

Hole 16 reports an intercept of 0.74 % nickel, 0.56% copper, and 0.767 grams per tonne of platinum, palladium and gold over an intercept of 11.0 metres, including an intercept of 1.54 % nickel, 0.89 % copper, and 1.171 grams per tonne of platinum, palladium and gold over 2.6 metres. This mineralised intercept contained several nickel-copper sulphide clasts believed to have been liberated from a proximal, ponded massive sulphide body.

PTM''s drilling results to date have confirmed the potential for higher-grade sections within the overall 800 meter long Sunrise Zone at Lakemount.

Results from Hole 16 compare well to the previously reported Hole 6 intercept of 0.74 % nickel, 0.67 % copper, and 0.93 grams per tonne of platinum, palladium and gold over 5.5 metres and to the previously reported Hole 8 results of 0.87 % nickel, 0.48 % copper, and 0.588 grams per tonne of platinum, palladium and gold over 13.5 metres, including an intercept of 1.40 % nickel, 0.69 % copper, and 0.769 grams per tonne of platinum, palladium and gold over 5.0 metres.

The exploration model for Lakemount targets the possible presence of undiscovered ponds of massive Nickel-Copper-PGM sulphides along the base of the intrusion as well as the further exploration of the known zones of disseminated and net-textured sulphides. Detailed study and analysis of the mineralization found in PTM''s drilling in both Phase 1 and Phase 2, particularly in the area of Holes 6, 8, and 16, support the potential for this model.

Detailed results are provided in the table below. Hole 16 is located approximately 70 metres along strike to the west of Hole 6, and about 240 metres along strike east of Hole 8. Holes 6, 8, and 16 have tested approximately 310m of strike length along the known 800 meter Sunrise Zone as defined in diamond drilling from 1942 to 1957.

Phase 3 exploration will commence shortly. Downhole and surface UTEM-4 electromagnetic geophysical surveys are now scheduled. The aim of these surveys will be to locate higher-grade massive sulphide mineralization, which will then be targeted by Phase 3 diamond drilling, which will immediately follow these surveys. UTEM-4 has been successful in locating such massive sulphide bodies in geological settings similar to Lakemount. Approximately 1,500m of drilling is planned for Phase 3, which will include further testing of the higher grade mineralization intersected in Holes 6, 8, and 16. New geophysical targets generated by the UTEM-4 surveys will be drill tested, both within and outside of the known Sunrise Zone.

\r\n



As previously announced in PTM''s news release of January 27, 2004, the gross metal value (US$) of the intercept in Hole 6 is provided as a tool for comparison to other multi-metallic projects. The value does not confirm the economic nature of the mineralization or take into account mining dilution, milling recoveries, smelter factors, or other factors that will not be detailed until completion of a feasibility study. Assuming a copper price of $1.00/lb, a nickel price of $5.00/lb, a platinum price of $800/oz, a palladium price of $200/oz and a gold price of $400/oz, the gross metal values of the 5.5m intercept in Hole 6 are $81.60/tonne nickel, $14.80/ tonne copper and $16.71/tonne platinum, palladium and gold for a total of US $113/tonne.

The gross metal value (US$) of the 2.6 metre intercept in drill Hole 16, assuming the same metal prices as above, is $170.18/tonne nickel, $19.60/ tonne copper and $19.79/tonne platinum, palladium and gold for a total of US $209/tonne.

The Lakemount Property is located 10 kilometres east of Wawa, Ontario along Highway 101 and covers an area approximately 4 by 6 kilometres. The highway and logging roads provide easy access to the known mineralized zones. Under an option agreement with Western Prospector Group Ltd., PTM can earn and purchase up to a 62% interest in the Lakemount Property from Western Prospector Ltd. and the underlying vendors.

Qualified Person and Quality Assurance and Control
Dennis Gorc P. Geol., Manager of Research and Acquisitions, is acting as the Qualified Person, "QP" for Platinum Group Metals Ltd., for this release. He is registered with the Professional Engineers and Geoscientist of British Columbia and the Association of Professional Geoscientists of Ontario. He also directed this drilling program. Drill core was sawn with half being retained for future study. The samples collected from the second half of the drill core was placed in containers sealed on site and tagged with a secure chain-of-custody security seal before being transported to the ALS Chemex (Thunder Bay) sample preparation facility. ALS Chemex upon receiving a sample shipment examined all containers to confirm that the attached security tag was intact and that the sealed container was also intact and has not been opened. PTM has inserted duplicates, blanks and standards in the assay sample stream as a part of its internal Quality Assurance and Quality Control program ("QAQC"). All samples were analyzed by ALS-Chemex Labs (Vancouver) for platinum, palladium, and gold by their PGM-ICP23 (30g fire assay - ICP finish) that included their own internal quality control program of standards and for nickel and copper by their ME-ICP61 method (27 elements by HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES). Samples, which returned overlimits (>10,000 ppm Cu, >10,000 ppm Ni) were analyzed for nickel or copper using their AA62 method Cu, Ni overlimits by HF-HNO3-HClO4 acid digestion, HCl leach and AAS finish.

ABOUT PTM
PTM is based in Vancouver BC, Canada and has active exploration programs in Canada and South Africa. The Company was founded in 2000 with the vision of tight physical markets for platinum group elements and the anticipated resulting increase the value of PGE mineral rights and resources by 2005. The Company is distinctive as a result of its focus on platinum and palladium and its property portfolio in both Canada and South Africa.

PTM holds significant mineral rights in the northern and western limbs of the Bushveld Intrusive Complex in South Africa and continues to acquire additional mineral rights in South Africa. The Bushveld Complex is the source of most of the world''s platinum.

The Company is also the largest mineral rights holders in the area surrounding Canada''s only primary platinum and palladium mine near Thunder Bay, Ontario. PTM also has a separate active joint venture at Agnew Lake, Ontario with Pacific Northwest Capital Corporation and Anglo Platinum Corporation Limited, the world''s largest producer of platinum.

On behalf of the Board of
Platinum Group Metals Ltd.

"R. Michael Jones"
President, Director
- 30 -

 

For further information contact:
John Foulkes, Manager Corporate Development
Platinum Group Metals Ltd., Vancouver
Tel: (604) 899-5450 / Toll Free: (866) 899-5450

R. Michael Jones, President
Platinum Group Metals Ltd., Vancouver
Tel: (604) 899-5450 / Toll Free: (866) 899-5450

The TSX Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management.
Note to U.S. Investors: Investors are urged to consider closely the disclosure in our Form 20F, File No. 0-30306, available at our office: Suite 800 - 409 Granville Street, Vancouver BC, Canada, V6C 1T2 or from the SEC: 1(800) SEC-0330.