May, 2013

 
 
 

April, 2013

 
 
South Decline
 
South Decline
 
South Decline
 
 
 
Underground at North Decline
 
Underground at North Decline
 
Underground at North Decline
 
 
 
Underground at North Decline
 
Underground at North Decline
 
Underground at North Decline 
 
 
 
Underground at North Decline
 
Underground at North Decline
 
Waterberg Core Yard 
 
 
 
 
 
Waterberg Core Yard 
 
 
 
 
 

October, 2012

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

South Boxcut
August, 2012

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Our Mining Contractor shares our view that Safety is Our Number One Priority and Communication of this message is re-affirmed with a Safety Drive
June 21, 2012

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

South Box Cut Excavation Advancing
June 20, 2012

 
 
 
 
 
 
 
 

June 14, 2012

 
 
South boxcut
 
Eskom Sub terrace
 
Central boxcut and infrastructure
 
 
 
 
 
 
 
 
South boxcut
 
 
 
 
 
 
 
 
 

South Boxcut
May 23, 2012

 
 
 
 
 
 
 
 
 
         
 
 
         
 
 
 
 
 
North: South box cut foreground,
main declines middle,
Village of Ledig approximately 10 km in the background
 
 
         

South Boxcut
May 15, 2012

 
 
 
 
 
 
 

April 12, 2012

 
 
 
 
 
 
 
 
 
 
         
 
 
 
         
 
 
 
         
 
 
         
         
 
 
         
         
 
 
         

April 2, 2012

 
 
Boxcut View
 
Boxcut View
 
Substation excavation
 
 
 
 
 
 
 
 
Boxcut with new Genset
in background
 

Standby Gen Set and transformer

 
Conveyor side decline face
before drilling
         
 
 
 
4 of our 75Kw vent fans
 

Compressor (electric)

 
Compressor
         
 
 
 
New bolting setup
 

Single boom with other equipment
in the background

 
Loading the face
         
 
 
 
Some parked equipment
 

Parked equipment

 
 
         

March, 2012

 
 
Scaler going underground
 
Jumbo in decline
 
Jumbo bolting face and back
in conveyor decline
 
 
 
 
 
 
 
 
Jumbo bolting face and back
in conveyor decline
 
Jumbo bolting face and back
in conveyor decline
&

January 31, 2012

 
 
 
 
 
 
 
 
         
       
         

 

December 12, 2011

 
 
JIC Safety Board
 
Loaded truck going up and the two boom Jumbo going down to underground faces
 
Drilling right undercut with single boom
 
 
 
 
 
 
 
 
Portal work
 
Left portal installing the larger fan and right portal drilling the breakthrough round with the two boom Jumbo
 
 
         

September 1, 2011

   

Capital Yard and Contractors

 

Water Storage tanks and
electrical construction

 

Concrete site construction

 
   
Rock bolting, near  

Ramp down the box cut

 

Equipment workshop construction in
foreground, temporary power
connection at left

 
   
Late August 2011 - site facilities. 
The box cut creates a ramp into
 

Box cut and site progress

 

Box cut nearing completion -
mid August, 2011

 

August 2011

   
Workshop construction  

Storage tank construction

 

 

Electrical infra installation structure

 
       
 Right decline position.
Tys Botha (PTM Project Geologist),
Peter Busse (PTM COO),
Frank Hallam (PTM CFO)
and R. Michael Jones (PTM CEO).
 

 

 

 

 

July 28, 2011
WBJV Project 1 Site Construction:

   
 
       

WBJV Project 1 Site Emergency Services:

   

July 18, 2011
WBJV Project 1
Site Photos Updated

   
 
       

July 11, 2011
WBJV Project 1
Site Photos

   
Unloading JIC office at site  

Boxcut from top of highwall

 

Shotcreting south sidewall

         
   

Shotcreting south sidewall (close-up)

 

North sidewall boxcut

 

2 backhoes and 4 trucks
inside boxcut excavating

         
   

View of site from north corner of boxcut

 

Slimes dam construction

 

Slimes dam construction (close-up)

         
   

Boxcut view from north toe

 

Boxcut view from north toe (close-up)

  Unloading cable at site
         
   
         
   
         
     

July 4, 2011
WBJV Project 1
Site Photos - Updated

 

 

         
 

 

         
 
         

June 27, 2011
WBJV Project 1
Site Photos - Updated


Maseve Project 1 Gate and Signs
 
Maseve Project 1 Cable Unload
   
         

 

June 1, 2011
WBJV Project 1
Site Photos

 

 

Exploration Manager, COO,
CEO, CFO
  Box cut excavations.   Drilling for blasting and excavation at the high wall site of the box cut.
         
   
Box cut and water control dam
and construction.
  Sloped drilling for blasting rock
at high wall of box cut.
  Box cut and site lay down areas in construction.
         
   
Styldrift head frame behind survey pegs at WBJV Site, excavation underway for water storage area.   People on site.   Approximately 20 people have been employed so far from the local area.
         
   
Box cut site.   WBJV box cut with Styldrift shaft in background.   Temporary power line for construction completed to site.

 

 

 